SKTTK • Electrical Technical Competency Certificate

The Sertifikat Kompetensi Tenaga Teknik Ketenagalistrikan (SKTTK), widely known as Serkom Listrik, is the legally mandated professional license issued under the authority of the Directorate General of Electricity (DJK), Ministry of ESDM. It serves as the official proof of technical qualification for technicians, field engineers, inspectors, and technical heads in the power and electrical sector.

Holding a valid SKTTK is mandatory for individuals acting as Technical Responsible Persons (PJT) or Technical Staff (TT) in companies holding SBUJPTL, as well as technicians executing electrical installation, operation, and maintenance on national grid systems.

All 6 SKTTK Competency Levels (Jenjang 1 - 6)

Under DJK ESDM regulations, technical competencies are structured across 6 qualification levels:

1

Level 1 - Junior Technician

Pelaksana Muda

Vocational SMK or technical high school graduate. Basic installation of low-voltage wiring, grounding systems, and electrical device mounting.

2

Level 2 - Field Technician

Pelaksana Madya

SMK with 1+ year or D3 Electrical graduate. Cable jointing, distribution transformer erection, motor termination, and panel assembly.

3

Level 3 - Lead Technician (TT)

Pelaksana Utama / Tenaga Teknik

Required Tenaga Teknik (TT) for SBUJPTL. Substation wiring leads, high-voltage line stringing supervisors, and turbine generator technicians.

4

Level 4 - Junior Analyst

Analis Muda

D3 with experience or S1 Electrical Engineering graduate. Electrical testing, relay calibration, insulation resistance analysis, and commissioning support.

5

Level 5 - Intermediate Analyst (PJT)

Analis Madya / Penanggung Jawab Teknik

Mandatory PJT for Small/Medium SBUJPTL. Senior power system design engineers, substation commissioning directors, and SLO inspection leads.

6

Level 6 - Senior Lead Analyst (PJT Utama)

Analis Utama

Mandatory PJT for Large and Foreign BUJKA entities. Grid interconnection principal advisors, national electrical masterplanners, and chief technical officers.

6 SKTTK Sub-Fields of Electrical Specialization

Candidates can certify across Generation (PLTU, PLTG, PLTA, PLTS, EBT), Transmission, Distribution, or Utilization:

Construction & Installation Bangsang

Erection, wiring, civil-electrical mounting, equipment alignment, and termination across power plants, grids, and facilities.

System Operation Pengoperasian

Local and control room operation (DCS/SCADA), power plant dispatching, switching coordination, and load shedding control.

Preventive Maintenance Pemeliharaan

Scheduled preventive maintenance, condition monitoring, thermal imaging, transformer oil analysis, and breaker overhaul.

Testing & Inspection Riksa Uji / SLO

Commissioning test procedures, high-potential (Hi-Pot) testing, protection relay secondary injection tests, and safety interlock verification.

Engineering Planning Perencana

Electrical system design, single line diagram (SLD) development, cable sizing, short-circuit calculations, and arc-flash modeling.

Supervisory Consulting Pengawas

Site electrical quality assurance, installation supervision, contractor submittal reviews, and safety standard compliance auditing.

SKTTK Document Requirements

  • Original e-KTP scan and personal NPWP.
  • Formal diploma in Electrical Engineering (Teknik Elektro) or Mechanical Engineering (Teknik Mesin) from an accredited institution.
  • Formal Photograph with red background (4x6 cm).
  • Comprehensive Curriculum Vitae (CV) demonstrating electrical field project experience.
  • Employer Assignment Letter / Certificate of Employment (Surat Keterangan Pengalaman Kerja).
  • Technical work portfolio (Single line diagrams, testing reports, commissioning records, or equipment maintenance logs).

Examinations are conducted by DJK-accredited Technical Competency Certification Bodies (LSK) through online written tests, portfolio verification, and oral interviews.

Accelerate Your Legal Certification

Consult with our certified legal advisors and LPJK/ESDM/BNSP specialists. Fast, compliant, transparent, and completely free initial assessment.